Started framing the main
deck.
Putting in the solid bridging.
Bridging nailed in ready for
plywood. Double nailing and glued the plywood to the frame.
The boss looking to see that we nailed the
deck. Lifting the wall the
easy way.
Looking at the rear right
side. Looking at the left front side.
Carob's checking the scrap
pile.
Front left side.
Garage and mud room
view.
Main stairway to second floor.
Note the framing lines up
.
Main stairway to second floor.
Framing the
gables.
Putting up the rafters.
Framing the garage
roof.
A beautiful spring day to be framing.
Ready for rafters on the main
house.
Main roof framed.
Chimney framed
in.
Started shingling the roof.
Trim and soffit detailing
.
The back of the main house.
Garage dormer
area.
Back wall of the garage dormer area.
Lead pan under all exterior doors.
Wrap all exterior wall with Tyvek house wrap.
Garage view ready for
siding.
Rear view ready for siding.
Master bedroom wing
view.
Master bedroom front with Hardi-plank clapboard siding.
Stones for the front
wall.
Started the front stone wall.
Working on the side stone wall.
Siding gable end of house.
Gable end of garage.
Seeded and mulched around septic field.
![]()