
UNDER CONSTRUCTION
Dinning area looking to the family room.
Family room looking to the front.
Family room looking to the kitchen and up.
2nd floor landing looking down on the family room.
2nd floor master looking to landing.
Master bedroom. (fog just rolled in over the water).
Front 1st floor bed room looking to the rear.
Looking to rear of master from master bath.
Another view of the house insulated.
The house is insulated and ready for the drywaller's.
Looking up at the drywall being taped & mud.
Looking to the kitchen area being drywalled taped & mud.
Installing the oak flooring in the master bedroom.
Another shot nailing down the oak flooring.
The oak flooring in the laundry area on the second floor.
Again looking at the oak in the laundry area.
Oak flooring in the living room area.
Looking at the oak flooring in the living room area.
All the oak flooring is in and walls are primed ready for the interior trim.
Trimming the second floor hall.
Trim detailing on the master ceiling.
Trimming the family room ceiling.
Boiler room under main stairway.
![]()